Back Bay · 1889 Brownstone
Full repipe, 3 baths
Galvanized risers replaced with a PEX-A home-run manifold through the existing chase. Eight access squares, all patched and painted. Occupied throughout.
6 days
Photographed on completion day. No staging, no stock, no other company's pipe.
Selected Work
Case Notes
Back Bay · 1889 Brownstone
Galvanized risers replaced with a PEX-A home-run manifold through the existing chase. Eight access squares, all patched and painted. Occupied throughout.
6 days
Somerville · Triple-Decker
Six cold rooms across three floors. Main venting resized and eleven runouts repitched. No boiler replacement, against two prior recommendations.
$1,180
Brookline · 1926 Colonial
Root-choked clay lateral under a mature copper beech. Cured-in-place liner from two access pits. The tree and the brick walk never moved.
62 ft